The complex has three wind farms: Carballeira, Bustelo, and Faladoira. They are in As Pontes (La Coruña) and Xermade (Lugo). The three power plants have a combined capacity of 161 megawatts (MW). The electricity production of the complex is fed into the general grid through the Tesouro substation, located in the municipality of As Pontes. The Carballeira wind farm has a total installed power capacity of 24.42 MW.
TRESCA Ingenieria was in charge of defining the:
- Basic engineering of the wind farm
- Civil and structural engineering, including the:
- Earthworks
- Design and calculation of plate foundations
- Industrial architecture and design of facilities of the control buildings and associated substations
- Buried pipelines
- Electrical and electromechanical engineering, including:
- Design and calculation of the DC Power system
- Design and calculation of the AC Power system
- Design and calculation of the Medium Voltage system
- Design and calculation of the grounding points of the Battery Cells
- Transformer centres (inverters + transformers)
- Planning of evacuation substation
- Planning of evacuation substation
- Planning of the manoeuvring substation
- Planning of the connection with existing substation
WORKS: