

To increase production, EVONIK asked TRESCA to eliminate the bottlenecks of the existing facility.
It was therefore necessary to intervene at different points in the production process. The primary responsibility of TRESCA was to assist the property in identifying solutions and subsequently executing the conceptual engineering, economic estimation of the final investment, and the delineation of subsequent stages.
WORKS:

Civil

Electric

Mechanical

Instrumentation and control

PROCESS

site management and supervision
