The Latem Aluminium Smelter operated with CNG and was not connected to the Spanish grid, so they required an 80 m3 LNG satellite plant and its regasification unit for its operation.
TRESCA Ingenieria was entrusted with the responsibility of the smelter’s design, and consequently, the satellite plant’s construction management, as well as the associated purchases.
- Flexible interconnection hoses
- 4″ LNG pipes
- Cryogenic deposits
- Cryogenic pumps
- Regasification plant
- Regulation and Measurement Station
- 1 1/2″ NG piping
- Odorizer
WORKS: