![Planta satélite de GNL para la planta de aperitivos GUS y su ERM asociada en Riego de la Vega Planta satélite de GNL para la planta de aperitivos GUS y su ERM asociada en Riego de la Vega](https://tresca.es/wp-content/uploads/2021/10/Planta-satelite-de-GNL-para-la-planta-de-aperitivos-GUS-y-su-ERM-asociada-en-Riego-de-la-Vega--1200x400.jpg)
GUS snack factory operated with CNG and was not connected to the Spanish grid, so it needed a 40-m3 LNG satellite plant and its regasification unit for its operation.
TRESCA Ingenieria was entrusted with the responsibility of the factory’s design, and consequently, the satellite plant’s construction management, as well as the associated purchases.
- Flexible interconnection hoses
- 2″ LNG pipes
- Cryogenic deposits
- Cryogenic pumps
- Regasification plant
- Regulation and Measurement Station
- 1 1/2″ NG piping
- Odorizer
WORKS:
![Civil Civil](https://tresca.es/wp-content/uploads/2021/08/Mesa-de-trabajo-3-90x84.png)
Civil
![Electric Electric](https://tresca.es/wp-content/uploads/2021/08/Mesa-de-trabajo-4-90x92.png)
Electric
![Mechanical Mechanical](https://tresca.es/wp-content/uploads/2021/08/Mesa-de-trabajo-5-111x90.png)
Mechanical
![Instrumentation and control Instrumentation and control](https://tresca.es/wp-content/uploads/2021/08/Mesa-de-trabajo-6-80x82.png)
Instrumentation and control
![PROCESS PROCESS](https://tresca.es/wp-content/uploads/2022/02/icono-proceso-80x80.png)
PROCESS
![site management and supervision site management and supervision](https://tresca.es/wp-content/uploads/2022/02/icono-direcc-y-superv-de-obras-90x90.png)
site management and supervision
![consulting consulting](https://tresca.es/wp-content/uploads/2022/02/icono-consultoria-90x90.png)