GES built the Dominica II wind farm for EGP in the State of San Luis Potosí, Mexico.
The wind farm consists of 34 wind turbines of 3 MW each, with a total installed capacity of 102 MW.
TRESCA Ingenieria was in charge of defining the:
- Basic engineering of the wind farm
- Civil and structural engineering, including the:
- Earthworks
- Design and calculation of plate foundations
- Industrial architecture and design of facilities of the control buildings and associated substations
- Buried pipelines
- Electrical and electromechanical engineering, including:
- Design and calculation of the DC Power system
- Design and calculation of the AC Power system
- Design and calculation of the Medium Voltage system
- Design and calculation of the grounding points of the Battery Cells
- Transformer centres (inverters + transformers)
- Planning of evacuation substation
- Planning of evacuation substation
- Planning of the manoeuvring substation
- Planning of the connection with existing substation
WORKS: