GES built the Dominica II wind farm for EGP in the State of San Luis Potosí, Mexico.
The wind farm consists of 34 wind turbines of 3 MW each, with a total installed capacity of 102 MW.
TRESCA Ingenieria was in charge of defining the:
- Basic engineering of the wind farm
 - Civil and structural engineering, including the:
 - Earthworks
 - Design and calculation of plate foundations
 - Industrial architecture and design of facilities of the control buildings and associated substations
 - Buried pipelines
 - Electrical and electromechanical engineering, including:
 - Design and calculation of the DC Power system
 - Design and calculation of the AC Power system
 - Design and calculation of the Medium Voltage system
 - Design and calculation of the grounding points of the Battery Cells
 - Transformer centres (inverters + transformers)
 - Planning of evacuation substation
 - Planning of evacuation substation
 - Planning of the manoeuvring substation
 - Planning of the connection with existing substation
 
WORKS:
    
        Civil
    
        Mechanical
    
        Electric
    
        