Detailed engineering for the construction of the Pena de Loba wind farm in As Pontes
TRESCA was involved in the construction of the Pena de Loba wind farm in As Pontes, with a project based on the basic and detailed design. The farm consists of 37 turbines of 600 kw. It consists of 37 turbines of 600 kw.
