Engineering project for the development of a regasification and energy production unit in the Port of Las Palmas
TRESCA undertook the construction of a regasification terminal with a port storage capacity of 10,000 m3 through the utilization of pressure tanks, and the possibility of utilizing a moored vessel with a capacity of 30,000 m3.